A cosmetic kitchen refresh can finish in days to two weeks, a same-layout replacement usually takes several weeks on site, and a layout change commonly runs two to four months from design to final inspection once you include design, permits and cabinet lead times.
Planning timelines by scope
| Scope | Design and ordering | On-site work | Kitchen unusable |
|---|---|---|---|
| Cosmetic | Days to 2 weeks | Days to 2 weeks | A few days |
| Same layout, new cabinets and counters | 3 to 8 weeks (cabinet lead time) | 3 to 6 weeks | 3 to 6 weeks |
| Layout change with new services | 4 to 10 weeks (plans, permit, lead time) | 6 to 12 weeks | 6 to 12 weeks |
What stretches the schedule
- Custom cabinets and stone counters that must be templated after the cabinets are in.
- Permit review and rough-in inspections on city calendars.
- Hidden problems behind the walls.
- Changing selections after the order is placed.
- Appliance delivery gaps before the counter template.
How to protect the timeline
- Freeze the layout and finishes before demolition.
- Order long-lead items first and confirm dates in writing.
- Ask for a week-by-week schedule with the trade for each week.
- Set up a temporary kitchen with a microwave, kettle and a sink elsewhere.
- Keep a contingency of a couple of weeks.
Keep planning
Frequently asked questions
How long can you go without a kitchen?
In a same-layout remodel, plan for roughly three to six weeks without a full kitchen and longer with layout changes. A temporary setup makes it livable.
Why do cabinets take so long?
Semi-custom and custom cabinets are made to order, and lead times of several weeks are common. Confirm the current time with the supplier.
Does the timeline include permits?
Not on-site time. Permit review is a separate step that can add weeks depending on the authority.
Timelines are planning ranges, not promises. Ask your contractor for a written schedule.